Your Equation

Library / Civil / CIV-53

Civil

Normally consolidated clay settlement

One-dimensional primary consolidation settlement of a clay layer of thickness H that is on its virgin compression line.

Ref
CIV-53
Rev
v1
Field
Civil
Result
S [m]

A clay layer on its virgin compression line shortens by an amount proportional to the void ratio change. With a compression index Cc, the void ratio falls by Cc log₁₀(σ′f/σ′0), and the strain is that divided by (1 + e0). Multiplying by the layer thickness gives the settlement S = H Cc log₁₀(σ′f/σ′0)/(1 + e0). The log relationship means each doubling of stress gives the same extra settlement.

One-dimensional primary consolidation settlement of a clay layer of thickness H that is on its virgin compression line. Cc is the compression index from a base-10 void-ratio against stress plot, e0 the initial void ratio, and σ′0 and σ′f representative initial and final vertical effective stresses with σ′f ≥ σ′0 > 0.

Calculator

Solve for
m
m
0.530
0.051.5
Pa
100,0002,000,000
Pa
10,000200,000
0.33
  • Stress ratio, σ′f/σ′02
  • Void ratio change, Cc·log₁₀(σ′f/σ′0)0.09031
  • Vertical strain, ΔS/H0.05017

What drives the result

Each variable is moved across its typical range while the others stay at the values above. The longest bar is the key driver.

Consolidation settlement (m) current value 0.2007 m
HLayer thicknessKey driver
0.02511.51
CcCompression index
0.03341
σ′fFinal effective stress
00.867
σ′0Initial effective stress
00.867
e0Initial void ratio
0.09030.278
  • The layer settles 200.7 mm, a strain of 5.017 %.
  • Each doubling of effective stress adds 200.7 mm, so the settlement depends on the stress ratio, not on the stress increase itself.
Chart data as tables

Ranked variables

VariableTypical rangeLowest resultHighest resultSwing (m)Local stepChange in result
H Layer thickness0.5 to 30 m0.025091.5051.48+10%+10 %
Cc Compression index0.05 to 1.5 0.033451.0030.97+10%+10 %
σ′f Final effective stress100,000 to 2,000,000 Pa00.86740.8674+10%+13.8 %
σ′0 Initial effective stress10,000 to 200,000 Pa00.86740.8674+10%−13.8 %
e0 Initial void ratio0.3 to 3 0.090310.27790.1876+10%−4.26 %

Sweep of Final effective stress

Final effective stress (Pa)Consolidation settlement (m)
100,0000
337,5000.3522
575,0000.5064
812,5000.6065
1,050,0000.6808
1,288,0000.7398
1,525,0000.7888
1,763,0000.8308
2,000,0000.8674

Sweep one variable

Consolidation settlement (m)Hover, touch, or use the arrow keys on the chart
00.20.40.60.8 500k1M1.5M2M Final effective stress (Pa) now 0.2007

Variables and how each one contributes

S

Consolidation settlement

Result · m

What the equation gives you. Everything else feeds it.

H

Layer thickness

m · typical 0.5 to 30

The initial thickness of the clay layer, in m. Scales the settlement in direct proportion. Raising it by 10 % (to 4.4) moves the result by +10 %, from 0.2007 to 0.2208 m.

Cc

Compression index

· typical 0.05 to 1.5

The compression index, from a base-10 void ratio against log stress plot. Scales the settlement in direct proportion. Raising it by 10 % (to 0.33) moves the result by +10 %, from 0.2007 to 0.2208 m.

σ′f

Final effective stress

Pa · typical 100,000 to 2,000,000

The final vertical effective stress at the middle of the layer, in Pa. A larger final stress raises the settlement, but with diminishing returns (log). Raising it by 10 % (to 220,000) moves the result by +13.8 %, from 0.2007 to 0.2283 m.

σ′0

Initial effective stress

Pa · typical 10,000 to 200,000

The initial vertical effective stress, in Pa. A higher starting stress lowers the settlement for the same final stress. Raising it by 10 % (to 110,000) moves the result by −13.8 %, from 0.2007 to 0.1731 m.

e0

Initial void ratio

· typical 0.3 to 3

The initial void ratio. A looser clay (higher e0) has a larger (1 + e0) divisor and settles less per unit of Cc. Raising it by 10 % (to 0.88) moves the result by −4.26 %, from 0.2007 to 0.1921 m.

Worked example with the values above

  1. Stress ratio: 200,000 / 100,000 = 2; log₁₀ = 0.30103.
  2. Strain: Cc log / (1 + e0) = 0.3 × 0.30103 / 1.8 = 0.0501717.
  3. S = H × strain = 4 × 0.0501717 = 0.200687 m.

Assumptions and limits

  • One-dimensional compression with a representative layer, and effective stresses throughout.
  • Primary consolidation by Terzaghi theory with a uniform initial excess pore pressure.

Common mistakes

  • Using natural logarithms with a base-10 compression index.
  • Using total instead of effective stresses.
  • Using the layer thickness instead of the drainage path for the consolidation time.

Statistics and uncertainty

Settlement predictions typically agree with field values only to within a factor of 1.5 to 2, and the time of consolidation can be out by an order of magnitude because the field coefficient of consolidation differs from the laboratory one. Observe the settlement during construction and update the prediction.

Where it is used

  • Predicting settlement of embankments and foundations on clay.
  • Planning how long a surcharge must stay in place.

Maths you need

  • Void ratio: volume of voids divided by volume of solids
  • Compression index: void ratio change per log₁₀ cycle of effective stress
  • Preconsolidation stress: the largest past effective stress the clay has carried

Related formulas

Practise this formula