Your Equation

Library / Civil / CIV-07

Civil

Open-channel flow (Manning)

Flow rate in a river, ditch or culvert from its slope and roughness.

Ref
CIV-07
Rev
v1
Field
Civil
Result
Q [m³/s]

Q discharge in m³/s, n Manning roughness, A flow area, Rh hydraulic radius (area divided by wetted perimeter Pw), Sf friction slope, equal to the bed slope for steady uniform flow. SI units.

Water flows faster in a smooth channel, a steeper channel, and one with a large cross-section relative to its wetted edge. Manning’s equation turns those into a flow rate.

Calculator

Solve for
m³/s
0.010.1
m²
0.150
m
0.540
m/m
1e-40.05
  • Hydraulic radius Rh0.4 m
  • Mean velocity Q/A1.321 m/s

What drives the result

Each variable is moved across its typical range while the others stay at the values above. The longest bar is the key driver.

Discharge (m³/s) current value 1.585 m³/s
AFlow areaKey driver
0.0252794
SfSlope
0.50111.2
PwWetted perimeter
0.2825.23
nManning roughness
0.2062.06
  • Roughness n is an empirical estimate and is the largest uncertainty; engineers often check the sensitivity over a range of n.
  • Flow is inversely proportional to n, so a weedy channel (n = 0.035) carries about 2.7 times less than smooth concrete (0.013) of the same shape.
  • For the same area, the most efficient shape has the smallest wetted perimeter: a semicircle or half-hexagon.
Chart data as tables

Ranked variables

VariableTypical rangeLowest resultHighest resultSwing (m³/s)Local stepChange in result
A Flow area0.1 to 50 m²0.02519793.6793.6+10%+17.2 %
Sf Slope1e-4 to 0.05 m/m0.501111.2110.7+10%+4.88 %
Pw Wetted perimeter0.5 to 40 m0.28185.2334.951+10%−6.16 %
n Manning roughness0.01 to 0.1 0.2062.061.854+undefined%—

Sweep of Slope

Slope (m/m)Discharge (m³/s)
1e-40.5011
2.175e-40.739
4.729e-41.09
0.0010281.607
0.0022362.37
0.0048623.494
0.010575.153
0.022997.599
0.0511.21

Sweep one variable

Discharge (m³/s)Hover, touch, or use the arrow keys on the chart
024681012 1e−45e−40.0020.010.05 Slope (m/m), log scale now 1.585

Variables and how each one contributes

Q

Discharge

Result · m³/s

What the equation gives you. Everything else feeds it.

n

Manning roughness

· typical 0.01 to 0.1

Concrete about 0.013, earth channel 0.025, weedy river 0.035–0.1. Inversely proportional: the channel surface is the most uncertain input.

A

Flow area

m² · typical 0.1 to 50

Cross-sectional area of the water. Increases flow with A^(5/3) when the shape scales up with it.

Pw

Wetted perimeter

m · typical 0.5 to 40

Length of channel boundary in contact with water. More wetted edge means more friction and a lower hydraulic radius.

Sf

Slope

m/m · typical 1e-4 to 0.05

Bed slope (drop per unit length). Flow rises with the square root of the slope: 4× the slope doubles the flow.

Worked example with the values above

  1. Hydraulic radius: Rh = A/Pw = 1.2 / 3 = 0.4 m. Rh2/3 = 0.5429; S1/2 = 0.03162.
  2. Q = (1/0.013) × 1.2 × 0.5429 × 0.03162.
  3. Q = 1.585 m³/s.

Assumptions and limits

  • Steady, uniform flow, so friction slope equals bed slope.
  • Prismatic channel, constant roughness.
  • Turbulent flow; SI form of the equation.

Common mistakes

  • Using the free-surface width instead of the wetted perimeter.
  • Using the US customary form (1.49/n) with SI units.
  • Applying to a short reach with changing depth.

Statistics and uncertainty

Roughness estimates from tables are typically uncertain by ±20–30%, which dominates all other errors. Slope errors are halved by the square root, and area is amplified by 5/3 power when the section scales.

Where it is used

  • Culvert and drainage design.
  • River crossing and fording assessments.
  • Flood-flow estimates from slope and depth.

Maths you need

  • Cross-section geometry: area and wetted perimeter
  • Exponents: powers 2/3 and 1/2

Related formulas

Practise this formula